Colin Tooke

“Great experience from start to finish. Called at 7am on a Sunday about a broken door closer and was all fixed before 10:30am same day. Customer service was friendly and prompt. Very professional , would highly recommend their services.”
Open
Residential and commercial · GTA, Hamilton and Barrie
Power door operator installation starts with a suitable opening and usable access. We assess the powered swing entrance, support, activation, electrical coordination and locking before agreeing the work.
Leave your details and get $50 off your first repair.
Original customer reviews
Handicap door opener installation is commonly requested when a manual entrance is difficult to use. A power operator can assist people using wheelchairs or walkers, people carrying items and others who find a heavy door challenging. The useful starting point is the route through the entrance and the door's current condition. Adding an operator to a binding leaf, an unsuitable frame or an awkward approach can leave important access difficulties unresolved even when the motor opens the door.
Tell us who uses the entrance, where the difficulty occurs and whether the work is a new installation, a replacement of an existing operator or part of a wider renovation. Door N Window assesses powered entrance work across the GTA. We are insured and WSIB Covered, and our line is available 24/7 to discuss a visit. Installation planning, parts and any electrical coordination follow the assessed scope. The aim is a usable operating arrangement for this opening, with its requirements established before equipment is selected.
A powered swing entrance may be part of a commercial replacement or a change to an existing manual opening. Identify whether the project retains the leaf and frame or includes a new commercial door installation. Operator mounting and controls need to suit the final assembly rather than an opening that is still being changed. Confirm the planned door support, preparation and provider responsibilities before equipment is ordered.
For a business entrance, identify how staff and visitors approach from each side and whether locking needs to release before powered movement. A change to the leaf, closer or support can affect the proposed operator arrangement. Establish the final hardware and access-control responsibilities with the project contact so door fitting, equipment mounting and electrical coordination follow one agreed scope. Accessible use remains part of that assessment rather than a separate motor attached after the rest of the opening is complete.
Look at how a person reaches the door, activates it and passes through. The approach space, door swing, threshold and position of the controls are connected. A button placed where someone has to move into the leaf's path can create a difficult sequence. A powered leaf also cannot remove an obstructed landing or repair a damaged threshold by itself. During the assessment, describe the route from both sides so the proposed activation and movement can account for entering and leaving.
Tell us about ramps, vestibules, nearby walls, furniture, signs and public foot traffic. Photographs showing the whole entrance and approach are more useful than a close-up of the proposed operator location alone. Do not assume that an operator used at another property will suit the same arrangement here. The existing door, available support and intended users affect the plan. If broader access changes are needed, identify them clearly rather than describing a motor installation as a complete accessibility solution for the property.
An operator relies on a leaf and frame that support its attachments and allow appropriate movement. The inspection considers the door construction, hinges or pivots, existing closer, latch engagement and the condition of the fixing points. A door that drags, drops or binds may need mechanical repair before automation can be planned. Additional force is not a substitute for correcting physical resistance. The assessment should distinguish work required on the opening from work required to fit and configure the operator.
The leaf's size and construction, opening direction and mounting space help determine a suitable application. A glazed aluminum entrance and a solid interior door may need different equipment arrangements and attachments. We discuss components that can be retained and work needed to prepare the opening. If damage or support limitations require a broader repair, that requirement belongs in the agreed scope. Commercial door repair may be needed before or alongside the new powered entrance installation.
Power operators are selected with the doorway, mounting arrangement, intended use and connected hardware in mind. A system designed for an intentional activation, such as pressing or waving at a device, differs from a fully automatic entrance that responds to approach detection. The equipment's instructions and the requirements for the proposed application guide the design. We do not describe every operator as interchangeable or assume that adding one component makes an existing entrance suitable for every user.
Discuss whether the opening is interior or exterior, how it is exposed to weather and how frequently it is used. Wind, door support and the installation environment are relevant to equipment selection and assessment. Availability of compatible parts and support documentation also matters for later service. The proposed scope should identify the intended system and its operating arrangement before you approve work. A clear specification is more useful than choosing solely by the appearance of an operator housing or activation plate.
Activation devices need to be considered from the user's approach on each side. The plan should address reach, visibility, door movement and space to wait for the opening. A person should be able to recognize how to activate the entrance and move through it without an awkward sequence around the swinging leaf. The final locations depend on the assessed layout and applicable requirements, rather than one universal position copied from a different doorway.
Push plates, touchless devices and other supported controls have different installation and connection considerations. Tell us if one side has limited wall space, outdoor exposure or an existing reader or intercom. Wiring or wireless activation must suit the chosen equipment and the site. After installation, the relevant devices need operating checks from both directions. Physically mounting a plate does not establish that its connection, activation and resulting door movement work together as intended.
A powered entrance needs a suitable electrical supply and a clear scope for the associated work. The assessment identifies the equipment requirements and what electrical coordination is needed at the property. Building staff should know who is responsible for that part of the installation, any access arrangements and whether another provider must attend. We do not assume that an outlet or existing cable near the doorway is suitable simply because it is visible.
Do not extend wiring, open electrical enclosures or connect equipment yourself to prepare for the visit. Supply requirements depend on the selected system and installation. If the project includes a renovation, electrical work should be coordinated with the responsible project contact so attachments and wiring routes can be planned together. The agreed scope should also explain any expected interruption to the entrance and how people will access the property while the work is underway.
An entrance with an electric lock or access-control system needs the lock-release and opening sequence planned together. The operator should not be treated as an independent motor that can simply push against whatever hardware is already installed. Identify who manages the lock, reader, intercom and controller. A building's security provider may need to participate so the proposed operation can respect both access and securing requirements.
Tell us if the door is paired with another leaf or is part of a vestibule. The relationship between active and inactive leaves, locking hardware and activation points can affect the sequence. The handover should explain the intended operating modes and what is expected from connected equipment. Do not provide passwords in a repair or installation enquiry. Describe the systems and responsible contacts instead, allowing the scope to be coordinated without changing or bypassing the property's security arrangements.
Building and accessibility requirements must be considered for the actual project. An existing opening, a new building and an extensive renovation can involve different questions and responsibilities. The Ontario government overview of accessibility in buildings explains the role of the Building Code in construction and major renovation. The applicable requirements for your entrance should be established with the responsible designer, property contact and authority as appropriate to the project.
We do not describe installation of an opener as a building-wide compliance certificate. The wider route, clearances, thresholds, hardware and other property conditions may need consideration beyond the operator. If drawings or a specification already exist, provide them to the authorized project contact for the installation assessment. Tell us about an identified fire door or required exit before work is agreed. Its construction, labels, hardware and operating requirements need consideration rather than assuming any new device can be added to it.
The installation follows the agreed equipment and opening preparation. Mounting the operator, fitting its arm or drive arrangement, connecting the supported activation devices and coordinating the associated hardware are parts of one operating system. Manufacturer instructions for the selected model guide the work and configuration. Adjustments belong to the actual system and application; this page does not provide settings for a building owner to copy into a different operator.
Checks should consider activation from the intended positions, the movement of the leaf, connected locking and the equipment's applicable detection functions. Paired or vestibule entrances need their intended sequence considered. Staff should understand any normal operating modes they are expected to manage and have the relevant instructions available. If more coordination or a component remains outstanding, that limitation should be identified clearly rather than presenting a partial arrangement as a completed installation.
Plan how staff, visitors and deliveries will enter while the installation is underway. A shop, clinic, managed residential building and office can have different peak-use periods and authorization procedures. Tell us about those conditions before the visit. The work sequence depends on the assessed doorway, available equipment and any other provider involved. We discuss scheduling, but do not promise that every installation can be completed during one visit or during a particular business break.
At handover, establish what has been installed, how the intended controls operate and what routine observations or checks the manufacturer provides for the occupier. Report changes in motion, delayed response, unusual noise or failed checks promptly. Do not compensate for a developing fault by repeatedly changing settings or defeating devices. Automatic door operator repair addresses an existing powered entrance that is no longer functioning as expected; it is a separate intent from planning a new installation.
The saved customer feedback below relates to existing automatic-opening and door-closing equipment. Boris Stoikos's excerpt mentions an automatic door opener issue. Colin Tooke's separate excerpt mentions a broken closer. Their missing endings are not reconstructed, and these accounts are not presented as documented new opener installations. Original wording and individual ratings are retained. New installation photographs and case studies are added only from documented work after privacy review.
For the assessment, focus on the existing opening, intended access and the equipment and coordination it needs. Closers and other hardware can affect the new operating arrangement, so door closers and push bars may also be relevant. A useful installation plan identifies the work on the door, activation, power and locking, explains the remaining responsibilities and provides a clear handover for the people who will use and manage the entrance.
For planning beyond an individual component fault, our automatic door accessibility planning guide explains the approach, activation, complete entrance and relevant project requirements. It helps prepare an assessment without treating one repaired part or installed operator as proof of whole-building compliance.
This saved feedback concerns existing automatic-opening and door-closing equipment. Original excerpts retain their missing endings.
5 / 5 stars
“Great experience from start to finish. Called at 7am on a Sunday about a broken door closer and was all fixed before 10:30am same day. Customer service was friendly and prompt. Very professional , would highly recommend their services.”
Customer reviews
Reviews related to this service first, followed by more customer experiences. Open any review to see the original feedback and photos.
Open a review to read the original customer feedback.
Read more customer reviews






















Work at these locations includes jobs through facilities contractors. Logos belong to their owners; no affiliation, sponsorship or endorsement is implied.
This service
Repairs, replacements and the right next step for your property.
An on-site assessment establishes the opening preparation, equipment and coordination needed. You approve the scope and quote before paid work begins.
We assess the opening, measurements and work needed before preparing a quote. Call or leave your details to discuss a visit.
The work
Check the door, frame, support, operating hardware and route through the entrance before selecting the equipment.
Agree a suitable system, supported controls and the coordination needed for power and connected locking.
Complete the agreed installation, operating checks and handover, identifying any remaining provider coordination or restrictions.
Read project descriptions and original customer feedback about door, window and glass work.
View project descriptionsExplore repair options for doors, windows and glass. Explore our services.
How it works
Call or send the details. Photos are helpful, but optional.
We assess the job on site. You approve the price before paid work starts.
We secure unsafe openings and arrange the agreed repair or installation.
An itemised invoice describing the work.
Door, window and glass work for homes and businesses. Insured, WSIB Covered and available 24/7.
Insurance claims
After a break-in or property damage, we help with paperwork describing the damage and repair.
Coverage and reimbursement depend on your policy and your insurer's approval.
How we help with your claimService areas
Residential and commercial service across Toronto, Peel, York, Durham and Halton, plus Hamilton, Barrie and nearby communities.
FAQ
If yours is not here, call and ask. We would rather answer it now than have you guess.
It may be possible after the leaf, frame, support, hardware and approach are assessed. A binding or damaged opening may need repair first. The selected operator and mounting arrangement must suit the application. We establish the proposed scope rather than promising compatibility from a photograph alone.
An operator addresses part of the entrance's operation. The approach, threshold, clearances, control positions and wider route can still affect access. Applicable project requirements need assessment for the actual property. We do not describe an opener installation as a building-wide accessibility or compliance certificate.
The plan considers the approach from each side, reach, visibility, the door swing and available waiting space, together with applicable requirements. Equipment instructions and connections also matter. We assess the layout instead of copying a control position from another entrance with different conditions.
Those options can be discussed when selecting equipment suitable for the opening. Compatibility, placement, wiring or wireless connections and the intended application need consideration. The proposal should explain the supported controls and how people will use them. Not every control works with every operator or installation.
Its movement and support need assessment before automation is agreed. Hinges, pivots, alignment, the closer or latch may require work. Increasing motor force is not a substitute for correcting physical resistance. The scope should distinguish preparation of the opening from installation of the powered system.
The assessment identifies the selected equipment's requirements and the electrical coordination needed. The agreed project scope should state who is responsible for that work and any access arrangements. Do not extend cables, open electrical enclosures or connect an operator yourself to prepare for installation.
The lock-release and opening sequence need coordinated planning. Identify the provider responsible for the reader, lock and controller and keep an authorized project contact available. We discuss what door work and provider coordination are needed rather than assuming an operator can overcome an existing locked leaf.
Yes, the intended route and operating sequence should be considered through the vestibule. Activation locations and coordinated or separate controls may affect each opening. Whether both require equipment or other work depends on the actual project and applicable requirements, which should be established before the installation scope is approved.
Provide the address, property type, authorized contact, whole-entrance photographs and any existing equipment or project specification. Explain the access difficulty, operating hours and security arrangements. Identify any required exit or fire door. Do not dismantle hardware or approach an unsafe opening to collect information.
They should understand the installed controls, intended operating modes, completed checks and any remaining restrictions or coordination. Keep the equipment's supplied instructions and occupier-check information available. Report faults rather than bypassing devices or repeatedly changing settings. Any unfinished part of the scope should be clearly identified.
Call and describe it, or send the details through the form.